Tuesday, 19 March 2013

Punjab Irrigation Department Results Junior Engineer Written Exam 2013 | PID Jr. Engineer (Electrical Mechanical Civil) Exam Results | www.pbirrigation.gov.in

Punjab Irrigation Department Junior Engineer Written Exam Results 2013


Punjab Irrigation Department (PID) has declared the Junior Engineer WrittenExam Results 2013 on its Official Website www.pbirrigation.gov.in.

Lots of candidates had given Punjab Irrigation Department Junior Engineer Written Exam 2013.But now waiting period is over because PID Junior Engineer Written Exam Result 2013 have been declared by Punjab Irrigation Department (PID).

All candidates can get their Punjab Irrigation Department Junior Engineer Written Exam Results 2013 from given below links.

Note: Here we have described Three Links for This Result. So check all below links for gathering proper & get more information.





To Get Latest News of Recruitments, Results, Admit Cards / Hall Tickets, Answer Key, Examination Syllabus, Admission & get also Technology etc. through enter Your E-mail address to subscribe in our website. If you like this article then you can share it in your group circle, friends, colleagues, relatives or social networking sites like Facebook, Tweeter etc. Further, you can get all latest info by liking our Facebook page CLICK HERE & get Recruitments, Results, Admit Cards / Hall Tickets, Answer Key, Examination Syllabus, Admission & get also Technology etc. related news will be directly posted on your wall.


Punjab Irrigation Department History

Punjab, the name derived from the Persian words, Punj (five) and ab (water) was a land of five rivers which formed part of Indus Basin till 1947. After partition of the country, Indus water Treaty-1960 restricted India’s rights of usage to only three Eastern rivers (Sutlej, Ravi and Beas), the three Western rivers (Indus, Chenab and Jhelum) were earmarked for exclusive usage of Pakistan. Punjab does have a very well developed and interlinked river system and widespread 14500 kms long Canal Systems.

These Systems are more than a century old and it is difficult to even imagine today to develop such a system of high level strength and utility. The estimated value at the present price level of Water Resource Infrastructure in the State is more than Rs.50,000.00 crore.Punjab Irrigation Department was set up in the year 1849 and has a number of milestones worth mentioning. Construction of upper Bari Doab Canal from river Ravi at Madhopur, Sirhind Canal from river Sutlej at Ropar, Eastern Canal & Bikaner Canal from river Sutlej at Hussainiwala headworks date back to pre-independence era. Post independence period is still brighter when monumental multipurpose projects like Bhakra Dam on river Sutlej, Pong Dam on river Beas, Beas Sullej Link Project and Ranjit sagar Dam on river Ravi have been constructed in addition to construction of Nangal Hydel Channel, Anandpur Sahib Hydel Channel, Bhakra Canal System, Mukerian Hydel Channel,Shah Nehan Barrage, Harike Barrage etc.



No comments:

Post a Comment

If you Like this news please put your comments, So we can improve our Quality Services as soon as possible.

With Regards,
Best Information Blog Portal India Team